Procedure
Two marking-o templates are required for ground mounting. A small marking-o
template determines holes on the ground, and a large marking-o template determines
holes on the wall.
Step 1 Cut the marking-o template along the dotted line.
Figure 5-3 Cutting the
marking-o template
Step 2 Mark mounting holes for the base.
Figure 5-4 Marking mounting holes for the base
Step 3 Mark the mounting holes for battery modules.
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1)
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1) 5 System Installation
Issue 01 (2022-07-15) Copyright © Huawei Technologies Co., Ltd. 50