EasyManua.ls Logo

Hunter GSP9712 - 7 Calibration and Maintenance; Calibration Procedures

Hunter GSP9712
150 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
116 7. Calibration and Maintenance GSP9700 Series Road Force Measurement System Operation
7. Calibration and Maintenance
7.1 Calibration Procedures
The “Calibration” primary screen can be selected by pressing “Calibrate” from the
“Logo” screen. The “Calibration Procedures” primary screen contains a list box of
calibration procedures. As the procedures are individually highlighted by selecting
” or “”, the equipment components to be calibrated for each procedure are shown
in yellow on the illustrated GSP9700.
Begin calibration procedures by selecting “Begin Procedure.” When finished
calibrating, select “Exit.”
Throughout the calibration procedures, “Back Up” can be selected to return to the
previous step.
The calibration weight used for calibrating the balancer and the inner dataset arm is
stored in one of the weld nuts located on the back of the base assembly or in the
weight tray.
BACK OF
BALANCER
CALIBRATION
WEIGHT
WELD NUT
Dataset
®
arm and load roller calibrations require the optional calibration tool,
221-672-1.

Table of Contents

Related product manuals