Transition time (the time necessary for the UPS to transfer from utility power to
full-load battery power).
The longest potential time period the UPS might be required to supply backup
power.
Whether the UPS unit provides online protection.
2.2 Installation Tasks Checklist
To perform the actual switch installation, the site implementation engineer must
perform the following tasks, which are detailed in this section.
Caution: Be sure to review the safety information before starting the installation and during the
installation process (refer to “Safety Information” on page 12).
1. Check the installation site to verify the installation of cabinet power feeds, rails,
and grounding.
2. Unpack the equipment and inspect for any shipping damage. Any shipping damage
should be reported to the shipping company.
3. Verify that the equipment shipped matches the packing list.
4. Mark the rack and install the mounting rails.
5. Physically install the switch in the rack.
2.2.1 Tools and Equipment Required
An ESD wrist strap
A #0 and #2 Phillips screwdriver
An M6 HEX nut wrench
Lifting device (e.g., pallet jack) for the Intel
®
Omni-Path Director Class Switches
100 Series
2.2.2 Check the Installation Site
The switches are designed to be installed in an existing server cabinet (not a telco
cabinet), where it can be mounted in a standard equipment rack.
Be sure of the following:
The cabinet has a full earth ground to provide reliable grounding.
There is enough room to work on the equipment.
The equipment will have enough clearance for front and rear access.
The cables can be accessed easily.
Water or moisture cannot enter the switch.
The ambient temperature stays between 50°–113°F (5°–40° C).
Cabinet doors do not interfere with front-to-back air flow.
The cabinet should have its own switchable power distribution. If the switch has two
power supplies, it is suggested that a cabinet with dual power distribution units is used.
It is recommended that cabinet anti-tip devices are used. This is especially true if
installing or removing a switch in the upper half of the cabinet when the lower half is
empty.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Intel 100 Series and is the answer not in the manual?

Intel 100 Series Specifications

General IconGeneral
Product TypeSwitch
Port Speed10/100/1000 Mbps
Switching CapacityVaries by model
Forwarding RateVaries by model
MAC Address TableVaries by model
Jumbo Frame SupportYes
DimensionsVaries by model
WeightVaries by model
Number of PortsVaries (typically 8, 16, 24, 48)
Port CountVaries by model
Data Transfer Rate1 Gbps