Installing Director Class Modules
Spine, Leaf and Management Modules
NOTE
In order to maintain thermal integrity, all open Spine and Leafs slots must be
populated with filler panels.
2.4.5
2.4.5.1
Installation—Intel
®
Omni-Path Fabric
Intel
®
Omni-Path Fabric Switches Hardware
June 2019 Installation Guide
Doc. No.: H76456, Rev.: 10.0 61