– 25 –
5. MAINTENANCE OF SAWING MACHINE
5-1. Replenishing the designated places with grease
Apply grease to the bearings located at the front and
rear of intermediate presser.
1) Remove rubber plug
❶
. Add grease through hole
A
in the machine arm using an injector.
Grease should be replenished once
every two years or in the case of
changing the relevant part(s).
❶
A
WARNING :
Turn OFF the power before starting the work so as to prevent accidents caused by abrupt start of the
sewing machine.