Table 18: Site Preparaon Checklist
(Connued)
Item or Task For More Informaon Performed by Date
Plan rack or cabinet locaon, including
required space clearances.
"Clearance Requirements for Airow and Hardware
Maintenance for EX2300 Switches" on page 67
Secure the rack or cabinet to the oor and
building structure.
Desk or Wall
Verify that the wall meets the minimum
requirements for the installaon of the
switch.
"Requirements for Mounng an EX2300 Switch On
or Under a Desk or Other Level Surface or On a
Wall" on page 66
Verify that there is appropriate clearance
in your selected locaon.
"Clearance Requirements for Airow and Hardware
Maintenance for EX2300 Switches" on page 67
Cables
Acquire cables and connectors:
• Determine the number of cables
needed based on your planned
conguraon.
• Review the maximum distance allowed
for each cable. Choose the length of
cable based on the distance between
the hardware components being
connected.
Plan the cable roung and management.
RELATED DOCUMENTATION
General Safety Guidelines and Warnings
General Site Guidelines