Table 18: Site Preparaon Checklist
(Connued)
Item or Task For More Informaon Performed by Date
Plan rack or cabinet locaon, including
required space clearances.
"Clearance Requirements for Airow and Hardware
Maintenance for EX2300 Switches" on page 67
Secure the rack or cabinet to the oor and
building structure.
Desk or Wall
Verify that the wall meets the minimum
requirements for the installaon of the
switch.
"Requirements for Mounng an EX2300 Switch On
or Under a Desk or Other Level Surface or On a
Wall" on page 66
Verify that there is appropriate clearance
in your selected locaon.
"Clearance Requirements for Airow and Hardware
Maintenance for EX2300 Switches" on page 67
Cables
Acquire cables and connectors:
Determine the number of cables
needed based on your planned
conguraon.
Review the maximum distance allowed
for each cable. Choose the length of
cable based on the distance between
the hardware components being
connected.
Plan the cable roung and management.