EasyManuals Logo

Keithley 2015 Service Manual

Keithley 2015
158 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #156 background imageLoading...
Page #156 background image
L
Line power 1-3, 2-3
:LOCK B-6
:LOCK? B-7
Locking out calibration 2-23
M
Main CPU firmware replacement 5-11
Manufacturing calibration 2-24
Manufacturing calibration commands B-17
Measuring synthesizer signal amplitude 2-24
Miscellaneous calibration commands B-5
N
:NDUE B-8
O
Optimizing measurement accuracy A-13
Optimizing measurement speed A-14
Ordering information 6-2
P
Parts lists 6-2
Performance verification 1-1
Performing the verification test procedures 1-7
Power module wire connections 5-9
Power supply 4-6
Power supply checks 4-19
Power-on self-test 4-4
Preparing the Model 2015 for
calibration 2-7, 2-17
Principles of operation 4-6
Programming calibration dates 2-23
R
Recommended equipment 2-6
Recommended test equipment 1-4, 2-24
Remote calibration 2-16
Remote calibration code 2-5
Remote error reporting B-18
Remote manufacturing calibration 2-26
Removing power components 5-8
Repair considerations 4-3
Replaceable parts 6-1
Replacing the AMPS fuse 3-3
Resistance calibration 2-11, 2-19
Restoring factory defaults 1-6
Routine maintenance 3-1
S
:SAVE B-7
Saving calibration constants 2-23
Setting calibration dates and saving
calibration 2-16
Setting the line voltage and replacing the line
fuse 3-2
Short and open calibration 2-17
Sine generator circuitry 4-16
Software requirements C-2
Solder repairs 5-3
Specifications A-1
Static sensitive devices 5-4
Status byte EAV (Error Available) bit B-20
:STEP1 B-9
:STEP2 B-10
:STEP3 B-10
:STEP4 B-10
:STEP5 B-11
:STEP6 B-11
:STEP7 B-11
:STEP8 B-12
:STEP9 B-12
:STEP10 B-12
:STEP11 B-13
:STEP12 B-13
T
Temperature A-13, A-14
Test considerations 1-7
Test summary 1-7
Troubleshooting 4-1, 4-18
U
Unlocking manufacturing calibration 2-24
Using the *OPC command B-21
Using the *OPC? query B-21
V
Verification limits 1-5
Verification test requirements 1-3
Verifying AC current 1-13
Verifying AC voltage 1-10
Verifying DC current 1-12
Verifying DC voltage 1-8
Verifying frequency 1-17
Verifying function generator amplitude 1-19
Verifying resistance 1-14
Verifying temperature 1-16
Verifying total harmonic distortion 1-18
W
Warm-up period 1-3, 2-3

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Keithley 2015 and is the answer not in the manual?

Keithley 2015 Specifications

General IconGeneral
ModelKeithley 2015
CategoryMultimeter
DC Voltage Range100 mV to 1000 V
AC Voltage Range100 mV to 750 V
Frequency Range3 Hz to 300 kHz
Resistance Range100 MΩ
DC Current Range3 A
DC Current Accuracy0.05%
AC Current Range3 A
Display5.5 digit
ConnectivityGPIB
Power Supply100 V to 240 V AC, 50 Hz to 60 Hz

Related product manuals