Lucent Technologies -48V CPS4000/CPS4000 PLUS Cabinet Power System
4 - Table of Contents Issue 13 December 2000
Interconnecting the Initial and Supplemental Shelves 5 - 5
Installing Batteries 5 - 7
If J85504D-1 Battery Modules Are Installed 5 - 8
If J85504D-1 Battery Modules Are Not Installed 5 - 8
Installing Batteries Below 0°C Temperature 5 - 9
AC Input Wiring 5 - 10
Options 5 - 10
Notes 5 - 11
Input Assemblies 5 - 12
Installing Control Units 5 - 13
Introduction 5 - 13
Procedure 5 - 13
Office Alarm Wiring 5 - 14
Access to Alarms 5 - 14
Hardware Kit 5 - 14
Plug-in Modules 5 - 15
Introduction 5 - 15
Procedure 5 - 16
Low-Voltage Disconnect (LVD) Function 5 - 17
Overview 5 - 17
DC Distribution Wiring 5 - 18
Output Assemblies 5 - 18
Kits 5 - 19
Procedure 5 - 19
Distribution Modules 5 - 20
Introduction 5 - 20
ES610 5 - 21
ES611 5 - 22
ES613 5 - 23
Initial Start-up and Test 5 - 24
Checklist 5 - 24
Power Units 5 - 25
LED Test 5 - 26
Adjust Plant Voltage 5 - 27
High Voltage Shutdown Test 5 - 28
Boost Mode 5 - 29
Self-Diagnostics 5 - 30
Rectifier on Standby (1) 5 - 31
Rectifier on Standby (2) 5 - 31
AC Fail (1) 5 - 32
AC Fail (2) 5 - 32
Converter on Standby (1) 5 - 33
Converter on Standby (2) 5 - 33
Battery on Discharge 5 - 34
Distribution Fuse Alarm 5 - 35
Test Thermal Management Probe 5 - 36