2. Close the circuit breakers for the DC power cables A and B. To close the circuit
breaker, insert the fuse by pushing in the fuse while turning it clockwise. The
fuse-alarm LED above the fuse will no longer be lit when the fuse is properly
seated.
3. Restore power to the AW by pressing the ON/STBY switch on the front of the AW
totheON“|”position and holding it until the system starts to power up.
Console/LOM
Serial
LEDs
Alarms
Port
(DB 15)
PCI Slots
DC Power Connector B
HSSDC
FC-AL
Connector
RJ - 45
Ethernet
4 USB
Ports
Ultra SCSI
Power Supply
LEDs
SCC
Card
Serial
Port A
Serial
Port B
Parallel
Port
DC Power Connector A
4
2
3
1
Figure 4.8-2 Administrative Workstation Interface Configuration (
Netra
20)
Figure 4.8-3
Netra
t 1120 Power Panel
ADMINISTRATIVE WORKSTATION MAINTENANCE
Procedure 4.8
235-200-150
October 2005
Page 4.8-2 Issue 3.00L