EasyManua.ls Logo

Manitowoc MLC165-1 - Raise Handrails

Manitowoc MLC165-1
256 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Manitowoc Published 08-06-19, Control # 237-09_v2 4-15
MLC165-1 OPERATOR MANUAL SETUP AND INSTALLATION
4
Raise Handrails
This procedure only pertains to cranes equipped with
optional handrails (Figure 4-12
).
It is necessary to climb onto the top of the rotating bed for
this procedure. Take every precaution to prevent falling
off the crane.
1. Climb onto the top of the rotating bed at the ladder (1).
2. Remove the quick-release pins (2) from the shipping
position (View A) and rotate the handrails (3) or the
guards (4) to the working position (View B).
3. Reinstall the quick-release pins.

Table of Contents

Other manuals for Manitowoc MLC165-1

Related product manuals