Manitowoc Published 08-06-19, Control # 237-09_v2 4-15
MLC165-1 OPERATOR MANUAL SETUP AND INSTALLATION
4
Raise Handrails
This procedure only pertains to cranes equipped with
optional handrails (Figure 4-12
).
It is necessary to climb onto the top of the rotating bed for
this procedure. Take every precaution to prevent falling
off the crane.
1. Climb onto the top of the rotating bed at the ladder (1).
2. Remove the quick-release pins (2) from the shipping
position (View A) and rotate the handrails (3) or the
guards (4) to the working position (View B).
3. Reinstall the quick-release pins.

Table of Contents

Other manuals for Manitowoc MLC165-1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc MLC165-1 and is the answer not in the manual?

Manitowoc MLC165-1 Specifications

General IconGeneral
BrandManitowoc
ModelMLC165-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals