Manitowoc Published 08-06-19, Control # 237-09_v2 4-29
MLC165-1 OPERATOR MANUAL SETUP AND INSTALLATION
Install Upperworks Platform Sections
See Figure 4-27 for the following procedure.
The right side platform sections are stored on the right
crawler. The left side platform sections are stored on the left
crawler.
Starting at the FRONT on the RIGHT SIDE of the crane,
install the right side platform sections, as follows:
1. Lift the section (1) into position.
2. Hook the section lugs through the slots (4) in the frame
(5).
3. Rotate the section down so the notches in the section
engage the frame (5).
4. Slide the section forward as far as it will go.
5. Install the remaining sections in the same manner.
Platform section (2) must be closest to the rear of the
crane.
6. Once all of the right side sections are installed, hand
tighten the retaining screw (6) in the slot (4) and securely
tighten the lock nut (7) to lock the sections in position.
Starting at the REAR on the LEFT SIDE of the crane, install
the left side platform sections, as follows:
Note that the left rear section (3) is shorter than the rest.
1. Lift the section (3) into position.
2. Hook the section lugs through the slots (4) in the frame
(5).
3. Rotate the section down so the notches in the section
engage the frame (5).
4. Slide the section rearward as far as it will go.
5. Install the remaining sections (1 and 2) in the same
manner.
Platform section (2) must be closest to the front of the
crane.
6. Once all of the left side sections are installed, hand
tighten the retaining screw (6) in the slot (4) and securely
tighten the lock nut (7) to lock the sections in position.
Item Description
1 Platform Section (3 each side)
2 Platform Section with Screw (1 each side)
3 Platform Section (short) (1 left side)
4Slot
5Frame
6 Retaining Screw (1 each side)
7 Lock Nut
Figure 4-27
Left Side
Right Side