Series F Test Frames + IntelliMESUR
®
Software User’s Guide
Distance Results:
9.2 Step Types
Multi-step tests build upon the same functions as in Basic Tests, while separating out datum, prompting,
zero, and go-home functions. Preload is not integrated into steps as in Basic Tests. Instead, a preload
must be manually configured as a separate Load Limit step, followed by a Zero step.
Available steps are as follows:
9.2.1 Load, Distance, and Break
Each of these steps may be set up in the same manner described in Basic Test setup.
9.2.2 Hold
Hold a load (as described in Basic Test setup) or hold a position. Specify the hold period in hours,
minutes, and seconds.
To include the data points received during the Hold step in the Results calculations, enable Display
Results.
www.GlobalTestSupply.com
Find Quality Products Online at: sales@GlobalTestSupply.com