EasyManua.ls Logo

Maxi Comet Executive Exec-66-G - Receiving Shelf Set-Up

Default Icon
244 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Comet Executive Gas
2-14
6. Attach a dirt leg nipple (F) with a cap to
the lower run of the tee (D).
NOTE: A dirt leg in the gas
line upstream of the ironer helps
prevent malfunctions resulting
from rust, grit, dirt, and other solid
particles in the gas supply.
7. Make sure the manual gas valve (B) is
closed by rotating the handle to a 90° angle
from the direction of the gas pipe.
8. Extend the gas supply line to the top of
the tee (E).
NOTE: If possible, extend the
gas supply line directly from the
gas meter to the unit without any
other equipment connected to this
line.
CAUTION
Do not open any gas
valves at this time.
Receiving Shelf Set-Up
Required Tools
Screwdriver
Wrench: 7/16”
1. As necessary, loosen the screws which
secure the receiving shelf in position
(Figure 2-15).
2. Position the receiving shelf in its operat-
ing position.
3. Tighten the screws to secure in position.
Figure 2-15: The front receiving shelf can be
repositioned during installation.
TOC
INDEX

Table of Contents

Related product manuals