AVTM246004 BITE 2/2P Rev 4 July 2011
26
5. Connect the BITE current source leads to the battery and
then power on the transmitter.
6. Measure the cell impedance, voltage, and strap resistance.
7. Perform post-test activities such as transferring data,
reviewing and deleting data, and powering down and
disconnecting the transmitter.
The detailed procedures needed to perform these steps are
explained in the following subsections.
F
WARNING
Before attempting to use the BITE2 or 2P to perform a
test, be sure that you first read and understand the safety
requirements and operating procedures contained in this
manual. When using the BITE 2/2P, strictly observe all
safety precautions.
Operating Note
Do not perform a test while the battery is under a heavy
charge or discharge. If the battery under test has been
recently subjected to boost charging, a waiting period of 72
hours is recommended before performing an ac impedance
test or any other test. If the ac mains are out and the battery
is discharging to support the load, then unreliable impedance
measurements may be obtained. Relative impedance values
are affected by charge and discharge status, cell age, and
ambient temperature.
www.GlobalTestSupply.com
Find Quality Products Online at: sales@GlobalTestSupply.com

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Megger BITE 2 and is the answer not in the manual?

Megger BITE 2 Specifications

General IconGeneral
BrandMegger
ModelBITE 2
CategoryTest Equipment
LanguageEnglish

Related product manuals