EasyManuals Logo
Home>Mercury>Outboard Motor>Optimax 115

Mercury Optimax 115 User Manual

Mercury Optimax 115
522 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #42 background imageLoading...
Page #42 background image
OUTBOARD MOTOR INSTALLATION
90-855347R1 JANUARY 1999 Page 1D-5
2. Insert steering cable into tilt tube.
3. Torque nut to 35 lb. ft. (47.5 N·m).
Steering Link Rod
1. Install steering link rod per illustration.
a
d
c
b
a-Special Bolt (10-90041) Torque to 20 lb-ft (27 N·m)
b-Nylon Insert Locknut (11-34863) Torque to 20 lb-ft (27 N·m)
c-Flat Washer (2)
d-Nylon Insert Locknut (11-34863) Tighten Locknut Until it Seats, Then Back
Nut Off 1/4 Turn
IMPORTANT: The steering link rod that connects the steering cable to the engine
must be fastened using special washer head bolt (“a” – Part Number 10-14000) and
self locking nuts (“b” & “c” – Part Number 11-34863). These locknuts must never
be replaced with common nuts (non locking) as they will work loose and vibrate
off freeing the link rod to disengage.
WARNING
Disengagement of a steering link rod can result in the boat taking a full, sudden,
sharp turn. This potentially violent action can cause occupants to be thrown
overboard exposing them to serious injury or death.

Table of Contents

Other manuals for Mercury Optimax 115

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mercury Optimax 115 and is the answer not in the manual?

Mercury Optimax 115 Specifications

General IconGeneral
BrandMercury
ModelOptimax 115
CategoryOutboard Motor
LanguageEnglish

Related product manuals