6 - ORDINARY MAINTENANCE
6 - 7
• SCHEDULED MAINTENANCE AFTER THE FIRST 10 HOURS
NUTS AND BOLTS OF THE DRIVE COMPONENTS
Tighten the screws "V" of the universal joint coupling flanges to a torque of 11.7 kgm (115 Nm) (8 screws for each of the two
universal joints).
TYRES AND WHEEL COLUMNS
Check the tyre pressure with a pressure gauge and, if needed, inflate them
through valve "A".
The correct tyre inflation pressure is indicated on the sticker on the inside of the
wheel rim.
Check the correct tightening of the wheel columns "B" . If needed, tighten the
columns to a torque of 550 Nm.
• SCHEDULED MAINTENANCE AFTER THE FIRST 50 HOURS
NUTS AND BOLTS OF THE
STEERING COMPONENTS
FRONT BRIDGE (A)
Torque (30 kgm) the fastening screws
"A1" of the jack to the axle (4 screws).
REAR AXLE (P)
Torque the fastening screws "P1" of
the jack to the axle (4 screws).
REDUCTION HUB
Torque (32 Kgm) (Nm) the screws fastening the upper joint pin (4 screws for
each of the four reduction hubs).