8 - ATTACHMENTS AND OPTIONAL EXTRA
8 - 15
ATTACHMENT MAINTENANCE
Lubricate the concrete unloading flap operating cylinder "M" every 50 working hours, on the lubrication points shown (ref. 1)
• CONCRETE MIXER
For attachment assembly, operating and maintenance instructions, refer to the
relevant manual.
• DOUBLE LOG CLAMP
Assemble the attachment on the carriage as described in the paragraph INSTALLATION OF QUICK-COUPLING
ATTACHMENTS in this chapter and use it with the auxiliary controls in the cab as described in the paragraph CONTROL OF
HYDRAULICALLY FUNCTIONING ATTACHMENTS.
- Weight: 480 kg
- Attachment load corresponds to the machine's diagram
• DRUM CLAMP
Attachment for grasping 1 drum or
similar items.
Clamp rotation of 180° or 360°.
This attachment requires the machine
to be pre-set for a DUAL-FUNCTION
ACCESSORY.
- Weight: 220 kg
- Load of attachment: 600kg