Operator’s Manual of Anesthesia System 3 - 3
Installation and Disassembly Unpacking
3.1 Unpacking
When the anesthesia system is delivered, IMMEDIATELY inspect the box for any damage.
a. If there is NO damage and ALL tip indicators on the box exterior are intact, then sign and
date the bill of lading or airway bill to indicate safe receipt of the equipment.
b. If there is DAMAGE or ANY of the tip indicators on the box exterior have been activated, then
conditionally accept the delivery and clearly describe the damages on the bill of lading or
airway bill. BOTH the carrier and recipient must sign and date the bill of lading or airway bill.
Save all damaged factory packaging until further instructed by Mindray. The receiver should
immediately contact Mindray Customer Service.
3.2 Initial Setup
The initial setup of the anesthesia system must be performed by an authorized Mindray service
representative. Please contact Mindray Technical Support for any additional assistance.
3.3 Breathing System
Please install the breathing system, refer to 9.7.3.4 "Reassembly".