EasyManua.ls Logo

Mirae Mx200 - OPERATION PROCEDURE; SYSTEM CONNECTION CHECK

Default Icon
681 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 5 Preparation for Programming
5-7
Turn off and on the main power to normally restart the machine
(Otherwise, the machine will restart with the Amp reset message
displayed.)
The figure below shows the emergency button of the Mx100/200
system.
<Figure 3-2 Emergency push button switch >
Operation
Procedure
This section describes the operation procedure of
the machine.
The description given here assumes that:
- The PWB locking plate is exactly adjusted; and
- The PWB is loaded from the preceding process in the in-line mode.
System Connection Check

Table of Contents

Related product manuals