EasyManua.ls Logo

Mirae Mx200 - Preventative Maintenance; Routine Check;List; Regular Check List

Default Icon
681 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1-8 MS1 (Multi-Tray Supply Unit) Operation Manual
Preventative
Maintenance
For the MS1 system to maintain optimum performance, it is
essential to check the operation of each mechanical part and
immediately remove any foreign materials.
Keep all assemblies clean and periodically grease the moving
parts as specified in the following section.
To prevent mechanical damage, a part should be replaced before
it causes mechanical defects, considering lifetime of the part. A
machine stained with dust or foreign materials will not provide
optimum performance. Therefore, periodically check and clean the
machine and each assembly.
The following tables summarize routine and regular check items
and check periods.
1. Routine Check/List
Check
Time
Category
Item to be
Checked
Period
Required
Time
Before
operation
Power
Connection
check
Before
operation
Visual
Inspection
Air
Connection
check
Before
operation
Visual
Inspection
Warming
up
Assemblies
"Noise,
vibration”
Warming
up
1 minute
During
operation
Whole
System
"Noise,
vibration”
On
demand
After
operation
Error
Is an error
caused at a
specific part?
After
operation
1 minute
Cleaning
Remove foreign
materials such
as chips fallen
around
the machine.
After
operation
1 minute
2. Regular Check\List
Part
Item to be
checked
Period
Daily
Weekly
Monthly

Table of Contents

Related product manuals