Self-moving compact wheel loader, articulated frame, equipped with
multipurpose quick coupler, MULTIONE 2 Series
MultiOne SRL
Instruction manual (Translation of original instructions)
CM170003EN - 16.02.17 - 04 (11.07.18)
36/70
7 PRE-START INSPECTION
WARNING
IT IS COMPULSORY, BEFORE THE FIRST STARTING OF THE MACHINE, TO EXECUTE THE FOLLOWING OPERATIONS.
Ref. Operations
1 Make sure the machine is undamaged in all its parts (see par. 9.7.3).
2 Check the integrity of safety system (belt, ROPS, etc.) (see par. 9.7.3).
3 Check the engine oil level (see chap. 9.8.1).
4 Check the oil level of the hydraulic circuit (see par. 9.7.5).
5 Restore the power supply circuit of the battery by acting on the battery disconnecting key (see par. 7.1).
6 Check the nipples and if necessary provide with greasing (see par. 9.7.10).
7 Get used to the controls and their functions (see par. 4.3).
TAB. 18
7.1 Connecting / disconnecting battery
To restore the electrical connection of the battery proceed as follows:
1) Remove the cap from the hole in the battery switch.
2) Insert the special key (FIG. 16 - Ref. 1) into the battery switch and turn it clockwise.
Disconnect the battery, proceed as follows:
1) Turn the special disconnecting battery key (FIG. 16 - Ref. 1), counter-clockwise and store it in a safe place.
2) Close the hole of the battery disconnecting key using the special cap.
FIG. 16