Section 75 00-02-0878
2013-03-07 - 95 -
Condition Comment Note
MAINS FAILURE IN ###s Frequency or voltage measurement is outside the limits
the Mains failure
delay. Text in mains
MAINS U OK DEL ####s Mains voltage is OK after a mains failure
The timer shown is
the Mains OK delay
MAINS f OK DEL ####s Mains frequency is OK after a mains failure
The timer shown is
the Mains OK delay
Hz/V OK IN ###s The voltage and frequency on the genset is OK
out it is allowed to
operate the
COOLING DOWN ###s Cooling-down period is activated
COOLING DOWN Cooling-down period is activated and infinite
Cooling down timer
is set to 0.0 s
GENSET STOPPING This info is shown when cooling down has finished
EXT. STOP TIME ###s
EXT. START ORDER A planned AMF sequence is activated
on the mains during
QUICK SETUP ERROR Quick setup of the application failed
Connect the power management CAN line
ADAPT IN PROGRESS
The EMS-GC10 is receiving the application that it has
just been connected to
SETUP IN PROGRESS
The new EMS-GC10 is being added to the existing
application
SETUP COMPLETED
Successful update of the application in all EMS-GC10
units
Remove the power management CAN lines
PREPARING ENGINE IF Preparing engine IF
Downloading M-Logic to the unit