GT10/GT30 Usage Procedures
GT10/GT30
xiii
GT10/GT30 Usage Procedures
If you are using the GT10/GT30 for the first time, please follow the procedure outlined
below.
Procedure For Using the GT10/GT30
1. Confirm the items included with the product. page xv
Please confirm that all of the items have been included with the product you have
purchased. Products are carefully checked before being shipped, but if you do find
anything missing, please contact your dealer.
2. Confirm the items listed under “Safety Precautions”.
page xxv
Before using your product, please make sure you read the items listed under “Safety
Precautions”, in order to make sure your product is used safely. After reading the
precautions, please make sure the product is used correctly.
3. Install and wire the main unit.
page 19
Install the main unit, and connect the power supply, PLC connection cable and other
wiring. When installing and wiring the product, carefully read the explanation on pages
19 to 23 concerning the installation environment, andmake sure the product is installed
correctly, in an appropriate environment. For information on connecting the product to
the FP series PLC, and on entering communications settings, please see page 47 and
subsequent pages.
4. Set up the main unit.
page 31, 39
When the product is shipped from the factory, it is set up with specifications that enable
connection to the FP series PLC. If you plan to use the product without changing these
settings,nosetupisrequired,butifyouplantochangethesettings,youwillneedtofollow
the setup procedure outlined on page 31, 39 and subsequent pages. Particularly with
regard to the basic communication area to the PLC and other devices, please confirm
the settings carefully and change only those that are necessary.
J Main cases in which setup is necessary
·
When the device being connected is a general-purpose serial device (such as
a computer or microcomputer board)
·
When the basic communication area for the device is different from that
set when the product is shipped
5. Check communication with the external device (PLC, etc.).
page 50
Check the connections and communication with the external device. Connections and
communication with devices in the FP series PLC vary depending on the device, so
check the information on page 50 and subsequent pages.
6. Enter the operating environment settings.
page 79
In addition to the setup described at step 4, various detailed settings can be entered for
the GT10/GT30 operating environment. Enter any necessary operating environment
settings, referring to page 79 and subsequent pages.