Hardware Installation and Setup
3-26
Part 1120130
E 2011 Nordson Corporation
Installing Optional Equipment
Each item of optional equipment is shipped with instructions for installing and
operating the equipment. Refer to Section 7, Parts, for equipment part
numbers.
Connecting a applicator Driver, Pattern
Controller, or Timer
If applicable, complete the melter installation by connecting the applicators to
the desired applicator driver, pattern control, or timer. Refer to the product
manual provided with the device for information about installing and
operating the equipment.
Flushing the Melter
Before using the melter for production, it should be flushed to remove any
residue left over from factory‐testing. Flushing the melter is accomplished by
processing a minimum of one tank volume of hot melt through the melter,
hoses, and applicators.
Refer to Section 4, Operation, for information about filling the tank and
operating the melter.
Disposing of Melter
When your Nordson product has reached the end of its useful life, dispose of
it in accordance with local regulations.