EasyManua.ls Logo

Nordson AltaBlue - Filling the Reservoir; Operating Zones

Nordson AltaBlue
234 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Filling the reservoir
Operating the Melter
5-2
Part 1120130
E 2011 Nordson Corporation
Filling the Reservoir
1. Use a scoop to pour hot melt material into the hopper, leaving a minimum
of 2.54 cm (1 in.) of space between the top of the material and the top of
the hopper.
2. After filling, close the lid.
CAUTION! Before filling the reservoir, make sure both the hopper and the
hot melt material are clean and free of foreign substances.
CAUTION! Do not operate the melter on an empty or near empty reservoir. If
there is too little hot melt in the reservoir, it can overheat and char, potentially
causing a fault or alert condition.
Operating Zones
1. Access the Operator Display.
2. Touch a zone. You can do one of the following:
S Enable or Disable the zone
S Modify its setpoint temperature

Table of Contents

Related product manuals