Table of Contents i
Part 1120130
E 2011 Nordson Corporation
Safety 1-1.....................................................
Safety Alert Symbols 1‐1........................................
Responsibilities of the Equipment Owner 1‐2.......................
Safety Information 1‐2........................................
Instructions, Requirements, and Standards 1‐2..................
User Qualifications 1‐3.......................................
Applicable Industry Safety Practices 1‐3..........................
Intended Use of the Equipment 1‐3.............................
Instructions and Safety Messages 1‐4..........................
Installation Practices 1‐4......................................
Operating Practices 1‐4......................................
Maintenance and Repair Practices 1‐5.........................
Equipment Safety Information 1‐5................................
Equipment Shutdown 1‐6.....................................
Relieving System Hydraulic Pressure 1‐6.....................
De‐energizing the System 1‐6...............................
Disabling the Applicators 1‐6................................
General Safety Warnings and Cautions 1‐7......................
Other Safety Precautions 1‐10..................................
First Aid 1‐10.................................................
Safety Labels and Tags 1‐11.....................................
Introduction 2-1...............................................
Intended Use 2‐1..............................................
Electromagnetic Compatibility (EMC) 2‐1.......................
Examples of Unintended Use 2‐2..............................
Residual Risks 2‐2.............................................
Key Components 2‐3...........................................
Electrical Components 2‐4....................................
Pump Shut-Off Valve 2‐5.....................................
Pressure Control Valves 2‐5..................................
Modes of Operation 2‐6.........................................
Heating and Heaters Off (Normal Mode) 2‐6.....................
Standby 2‐6................................................
Fault 2‐6...................................................
Gear‐to‐Line Capability 2‐6......................................
Melter Identification 2‐7.........................................
Hardware Installation and Setup 3-1............................
Overview 3‐1..................................................
Additional Information 3‐1.....................................
Installation Tasks 3‐2........................................
Experience of Installation Personnel 3‐2........................
Installation Requirements 3‐2....................................
Clearances 3‐2..............................................
Ventilation 3‐6..............................................
Electrical Power 3‐6..........................................
Pump Drive Internal Filter 3‐7..................................
Other Considerations 3‐7.....................................
Unpacking the Melter 3‐8.......................................
Moving the Unpacked Melter 3‐8..............................
Contents of the Installation Kit 3‐8..............................
Customer‐Supplied Materials 3‐8
..............................
Configuring the Electrical Service 3‐10.............................
Residual Current Circuit Breakers 3‐10..........................
Connecting the Electrical Service 3‐10...........................