EasyManua.ls Logo

Nortec UL60 - Page 100

Nortec UL60
119 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9 Tabular overview of the program procedures Maintenance
100 © Nortec Electronics 2018
30 minutes before the end of the topping charge a signal requests for measurement of single cells
voltages and to control the electrolyte level.
Otherwise:
30 minutes before the end of the topping charge a signal requests to control the electrolyte level.
End of program.
In case an automatic cell tester is connected:
The capacity which was measured during the discharge until the time will be displayed, until the first
cell has fallen below 1.0V.

Table of Contents

Related product manuals