9.2.4 Program 120: Initial commissioning NiCd battery (manufacturer independent)
20: NiCd battery (manufacturer independent)
select Batteryprocessing:
P1: Initial commissioning
Enter:
Number of cells
Rated capacity
Step 1:
Charging with C
1
until a voltage of 1.55
V × number of cells is reached within at maximum
1 hour.
Step 2:
Discharging with C
1
to 1
V × number of cells within at maxium 30 minutes.
Step 3:
Charging with C
1
until a voltage of 1.55
V × number of cells is reached.
Step 4:
Topping charge C
5
for 1.5 hours.
Step 5:
Discharging with C
1
to 1
V × number of cells at maximum 30 minutes.
Step 6:
Charging with C
1
until a charging voltage of 1.55
V × number of cells is reached.
Step 7:
Topping charge C
5
for 1.5 hours.
In case no automatic cell tester is connected:
15 minutes before the end of the topping charge a signal asks for the measurement of the single cells
voltages and to control the electrolyte level.
Otherwise:
15 minuten before the end of the topping charge you are asked to control the electrolyte level.
End of program
Time monitoring:
Charging for maximum 90 minutes. Capacity maximum 1.6
C.
Voltage monitoring:
Monitoring minus ΔU > 30mV/cell during charging, error message:
minus delta U detected