EasyManua.ls Logo

Nortec UL60 - Program 410: Maintenance Pb Battery Sealed MIL

Nortec UL60
119 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9 Tabular overview of the program procedures Maintenance
© Nortec Electronics 2018 87
9.5.1 Program 410: Maintenance Pb battery sealed MIL
10: Pb battery sealed MIL
select Batteryprocessing:
P4: Maintenance
Enter:
Nominal voltage
Rated capacity
Step 1:
Discharging with C
5
until a voltage of 1.5 V is reached.
Step 2:
In case battery voltage is below 2.15 V × number of cells:
Precharge with 2.4 V × number of cells until charging current 0.4 C
1
is reached.
Step 3:
I-charge with 0.4 C
1
until charging voltage of 2.4 V × number of cells is reached.
Step 4:
U-charge with 2.4 V × number of cells until charging current is decreased to 0.02 C
1
.
Step 5:
Discharging with C
5
to 1.5 V for each cell. The here detected capacity will be used to ascertain the
effective capacity.
Step 6:
I-charge with 0.4 C
1
until the charging voltage of 2.4 V × number of cells is reached.
Step 7:
U-charge with 2.4 V × number of cells until charging current is decreased to 0.02 C
1
.
End of program
Display Battery evaluation:
C>90%:BATTERY OK
or
C>70%:BATTERY FOR UNCRITICAL USE
or
C<70%:BATTERY WITH RECORD TAKE DISCHARGED BATTERY OUT OF SERVICE
Time monitoring:
Precharge maximum 2 hours, I- and U-charge maximum 8 hours, capacity maximum 1.5 × C

Table of Contents

Related product manuals