EasyManua.ls Logo

Nortec UL60 - Program 220: Charge Nicd Battery (Manufacturer Independent)

Nortec UL60
119 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9 Tabular overview of the program procedures Charge
72 © Nortec Electronics 2018
9.3.7 Program 220: Charge NiCd battery (manufacturer independent)
20: NiCd battery (manufacturer independent)
select Batteryprocessing:
P2: Charge
Enter:
Number of cells
Rated capacity
Step 1:
Charge with C
1
until charging voltage of 1.55
V × number of cells is reached.
Step 2:
Topping charge C
5
for 1.5 hours.
In case no automatic cell tester is connected:
15 minutens before the end of the topping charge a signal asks for the measurement of the single
cells voltages and to control the electrolyte level.
Otherwise:
15 minutes before the end of the topping charge you are requested to control the electrolyte level.
End of program
Time monitoring:
Charging maximum 90 minutes.
Voltage monitoring:
Monitoring minus ΔU > 30mV/cell during charging, error message:
minus delta U detected

Table of Contents

Related product manuals