EasyManua.ls Logo

Nortec UL60 - Program 121: Initial Operation Nicd Battery HAWKER

Nortec UL60
119 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9 Tabular overview of the program procedures Initial commissioning
62 © Nortec Electronics 2018
9.2.5 Program 121: Initial operation NiCd battery HAWKER
Name according to manual: Commissioning charge (8 h)
This program also can be performed for maintenance charge (7 h).
21: NiCd battery HAWKER
select Batteryprocessing:
P1: Initial commissioning
Enter:
Number of cells
Rated capacity
Charging time span (set value: 8 hours)
Step 1:
Charging with C
5
for 8 hours or the time given in (eg. maintenance charge 7 h).
In case no automatic cell tester is connected:
15 minutes before the end of the charging a signal asks for the measurement of the single cells volt-
ages and to control the electrolyte level.
Otherwise:
15 minutes before the end of the charging you are requested to control the electrolyte level.
End of program
After the end of the program the battery needs to cool down to room temperature. Subsequent pro-
ceed with program Capacity Test 321 or Maintenance 421 according to Hawker instructions.
Voltage monitoring:
Monitoring minus ΔU > 30mV/cell during charging, error message:
minus delta U detected

Table of Contents

Related product manuals