EasyManua.ls Logo

Olivetti PR4 SR - 3.3 Slip Test Procedure; 3.4 Roll Test Procedure

Olivetti PR4 SR
79 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-4Service ManualXYAA6336
3.3 SLIP TEST
Activating this procedure makes it possible to check
the efficiency of the slip alignment assembly.
Operator action:
Activate the slip test mode as described in Secton 4.
Printer action:
1. Mechanical reset
2. Waits for slip insertion
Operator action:
Insert the slips successively and check alignment.
3.4 ROLL TEST
Activating this procedure makes it possible to check
the efficiency of the roll assembly.
Operator action:
Activate the roll test mode as described in Section 4.
Printer action:
PR4: Continuous printing on receipt and journal.
PR4 SR: Continuous printing on receipt
Note: This cycle lasts approximately two hours for
the receipt, four hours for the journal.
These cycles are used at the factory during the run-
in phase.
To interrupt the cycle open the front cover.

Table of Contents

Related product manuals