189
Conguring the Hybrid GHP/EHP control
Setting
6
Set delay groups for each time slot.
z Set the delay group (I to V) for each 30-minute slot. Touch
[Invl] if delay control is not to be used.
6
7
Touch [Register].
z The settings are registered and the operation dialogue
closes.
z To cancel the settings, touch [Cancel].
7
8
Touch [Delay group settings].
z The “Delay group settings” dialogue is displayed.
8
9
Put a check mark in the “Select” column.
z Select the demand delay group you want to edit.
9
Demand delay Ie to Ve These correspond to groups 1
to 5 and are referenced when
there is a change in the power
demand level.
Ig to Vg These correspond to groups 1
to 5 and are referenced when
there is a change in the gas
demand level.
Ctrl delay time
(min)
Shows the time (0 to 60 minutes)
to delay when the demand level
increases.
Release delay
(min)
Shows the time (0 to 60 minutes)
to delay when the demand level
decreases.
10
Touch [Set].
z The operation dialogue is displayed.
10
Continued on next page
Setting delay times [Delay time settings]

Table of Contents

Other manuals for Panasonic CZ-256ESMC3

Related product manuals