EasyManua.ls Logo

Panasonic CZ-256ESMC3 - Page 209

Panasonic CZ-256ESMC3
230 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
209
Maintenance settings
Setting
The “Test run” screen
A: Select the line numbers of the outdoor
units you want to run a test operation
for. The “Line No.” dialogue is displayed
when you touch this.
B: Set the link system of the outdoor units
you want to run a test operation for. The
“Link” dialogue is displayed when you
touch this.
C: Outdoor units are displayed in a list.
Item Explanation
Slct Select the outdoor units you want
to run a test operation for.
O/D unit The outdoor units in the linked
system selected at B are
displayed.
Stus The operation mode while testing
operation is displayed.
D: The indoor units that are connected to
outdoor units with a check mark in C are
displayed.
E: Test operation is performed. The operation dialogue is displayed when you touch this.
BA
C D
E
Running a test operation

Table of Contents

Other manuals for Panasonic CZ-256ESMC3

Related product manuals