EasyManua.ls Logo

Polaris IQ 2007 - Drive Train; Speedometer Cable Type Drive Train Assembly

Polaris IQ 2007
325 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.7
Final Drive and Brakes
6
DRIVE TRAIN
Speedometer Cable Type Drive Train
Assembly
NOTE: Set driven clutch offset following procedure
in the PVT System Chapter.
Lubricate components as outlined in the Periodic
Maintenance Table.
Tighten chaincase mounting nuts using a criss-
cross pattern.
Install jackshaft seal sleeve with beveled edge
towards brake disc, then install o ring inside sleeve.
A
B
C
D
E
E
= T
A = Driven Clutch Fastener = 17 Ft.Lbs. (23 Nm)
B = Jackshaft Flange Nuts = 17 Ft.Lbs. (23 Nm)
C = Speedometer Housing Nuts = 17 Ft.Lbs. (23 Nm)
D = Driveshaft Housing Nuts = 17 Ft.Lbs. (23 Nm)
E = Chaincase Mounting Nuts = 28 Ft.Lbs. (38 Nm)
CAUTION
Do not over-torque the chaincase mounting nuts.

Table of Contents

Related product manuals