EasyManuals Logo

Raven Envizio Pro Installation & Operation Manual

Raven Envizio Pro
232 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #160 background imageLoading...
Page #160 background image
Chapter 9
150 Envizio Pro and Envizio Pro II Installation and Operation Manual
AccuBoom™ Setup
Prior to using the AccuBoom feature of the field computer, the AccuBoom node must be programmed. Touch
the AccuBoom icon located within the System menu of the Tools menu to display the AccuBoom Configuration
screen.
Note: If the Function Disabled screen appears when the AccuBoom icon is selected, troubleshoot the
AccuBoom node. See the CAN Troubleshooting section in Chapter 4, CAN Networking and
Diagnostics or Chapter 11, Troubleshooting, for help troubleshooting the AccuBoom node.
The following options are available on the AccuBoom Configuration screen.
On Override
If AccuBoom is enabled during a job, the AccuBoom icon is displayed in the lower left corner of the Guidance
screen.
If the CAN Switch Box is installed with the field computer, the AccuBoom On Override feature can be activated
by toggling the ‘Master’ switch to the ‘Override’ position momentarily. The AccuBoom On Override time will
begin when the switch returns to the ‘On’ position.
Note: Holding the ‘Master’ switch in the ‘Override’ position will allow the operator to extend the override
time without modifying the override time.

Table of Contents

Other manuals for Raven Envizio Pro

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Raven Envizio Pro and is the answer not in the manual?

Raven Envizio Pro Specifications

General IconGeneral
BrandRaven
ModelEnvizio Pro
CategoryDesktop
LanguageEnglish

Related product manuals