12A-20
FUEL MIXTURE
Throttle valve: Removal - Refitting
F4R
12A
REFITTING
I - REFITTING PREPARATION OPERATION
a parts always to be replaced: Throttle valve seal
(11,04,06,25).
II - REFITTING OPERATION FOR PART
CONCERNED
a Refit:
-a new seal on the throttle valve,
-the throttle valve,
-the throttle valve bolts.
a Torque tighten the throttle valve bolts (10 N.m).
a Connect the throttle valve connector.
III - FINAL OPERATION
a Fit the intercooler air outlet pipe.
a Refit:
-the intercooler air outlet pipe bolts,
-the engine cover.