19A-68
COOLING
Plenum chamber: Removal - Refitting
F9Q
19A
II - REFITTING OPERATION FOR PART
CONCERNED
a Refit:
-a new coolant outlet unit seal,
-the coolant outlet unit.
a Torque tighten the coolant outlet unit bolts (10
N.m).
a Connect the coolant outlet unit hoses.
a Position the hose clips on the coolant outlet unit
using the tool (Mot. 1448).
a Connect the coolant temperature sensor connector.
III - FINAL OPERATION
a Refit:
-the intercooler air inlet pipe (see 12B, Turbochar-
ging, Intercooler air inlet pipe: Removal - Refit-
ting, page 12B-41) ,
-the battery tray (see Battery tray: Removal - Re-
fitting) (80A, Battery),
-the battery (see Battery : Removal - Refitting)
(80A, Battery),
-the scoop under the scuttle panel grille (see Scoop
under scuttle panel grille: Removal - Refitting)
(56A, Exterior equipment),
-the scuttle panel grille (see Scuttle panel grille:
Removal - Refitting) (56A, Exterior equipment),
-the windscreen wiper arms (see Windscreen wi-
per arm: Removal - Refitting) (85A, Wiping -
Washing),
-the engine cover,
-the engine undertray.
a Fill and bleed the cooling system (see 19A, Coo-
ling, Cooling circuit: Draining - Refilling, page
19A-17) .