EasyManua.ls Logo

Renault F4R - Page 986

Renault F4R
993 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19D-31
ENGINE MOUNTING
Right-hand suspended engine mounting: Removal - Refitting
F9Q
19D
II - OPERATION FOR REMOVAL OF PART
CONCERNED
a Unclip the fuel pipes (3) .
a Remove:
-the upper engine tie-bar bolts (4) ,
-the upper engine tie-bar.
a Mark the position of the right-hand suspended engi-
ne mounting on the body using a indelible pencil.
a Remove:
- the right-hand suspended engine mounting bolts
(5) on the body,
- the bolts (6) from the right-hand suspended engine
mounting on the engine,
- the right-hand suspended engine mounting.
REFITTING
I - REFITTING OPERATION FOR PART
CONCERNED
a Refit the right-hand suspended engine mounting in
relation to the mark made at the time of removal.
a Torque tighten the right-hand suspended engine
mounting bolts (62 N.m).
a Refit the upper engine tie-bar.
a Tighten to torque:
- the engine tie-bar bolt on the body (110 N.m),
- the engine tie-bar bolt on the engine (115 N.m).
a Clip on the fuel pipes.
II - FINAL OPERATION
a Remove the (Mot. 1453) and (Mot. 1453-01).
a Refit:
- the front left-hand bonnet stop,
133990
137752
136181

Table of Contents

Related product manuals