CABINET INSTALLATION PROCEDURE
B264/B265 1-88 SM
1.21 CABINET INSTALLATION PROCEDURE
CAUTION
Unplug the main machine power cord before starting the following
procedure.
1. Unpack the cabinet.
2. Remove all tape and shipping materials.
3. Install the 2 longer [A] locating pins and the shorter [B] locating pin.
4. Install the LCT mounting screws [C] (2 types x2).
5. Remove the paper trays [D].
B542I557.WMF
B542I112.WMF
[D]
[B]
[A]
[C]