EasyManua.ls Logo

Robopac MASTERWRAP PLUS XL FR - MACHINE INSTALLATION PROCEDURE

Robopac MASTERWRAP PLUS XL FR
107 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
38
INFORMATION ON HANDLING AND INSTALLATION
ENG
4.4. INSTALLATION OF THE MACHINE
The machine must be installed in an area which fulfils the requirements indicated in paragraph “Installation environment
characteristics”.
If necessary, identify the exact position by plotting the coordinates for correct positioning.
Danger - warning
Authorised technical service personnel must perform installation and assembly operations.
Proceed as follows:
1.
Cut the straps fastening the machine to the pallet.
2.
Remove the mounting brackets (A-B) for transport.
The components for the fastening of the column to the ground are in the bag (C).

Table of Contents

Related product manuals