EasyManua.ls Logo

Robopac MASTERWRAP PLUS XL FR - Work Area Delimitation Barrier Installation (Optional)

Robopac MASTERWRAP PLUS XL FR
107 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENG
INFORMATION ON HANDLING AND INSTALLATION
43
4.4.3. WORK AREA DELIMITATION BARRIER INSTALLATION (OPTIONAL)
1.
Identify the installation position of the barrier (A).
2.
Drill the holes (ø10 x 70mm) on the floor in correspondence of the barrier fastening holes.
Important
Thoroughly clean the holes to eliminate any residual material.
3.
Fix the stop device to the ground by means of plugs (B).

Table of Contents

Related product manuals