EasyManua.ls Logo

Roche Cedex Bio System - Page 482

Roche Cedex Bio System
496 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Roche Diagnostics
F-12 Operator’s Manual · Version 3.1
Index Cedex Bio System
calibration
checking if due, B–31
definitions, B–153, B–165
deleting orders, B–63
deleting results, B–95
during Prepare phase, B–30
forecast period, A–29
introduction, A–26
ISE, E–12, E–26
main ISE calibration, E–12
overview, A–26
performing, B–59
reserve, A–29
schedule, B–96
selecting tests, B–62
short guide, B–60
validating results, B–64, B–65
calibration list, screen, A–101
calibration results
auto accept, B–64
obsolete, A–28
calibrator lot, defining, B–103
calibrators
placing, B–32, B–62, B–63
specifications, A–66
certificates, importing, B–115
changing
configuration values, B–135
low voltage fuses, D–49
mains fuses, D–47
orders, B–42
password, B–157
user definitions, B–159
characters, special, A–76
checking
alarm messages, B–48
bottle sets, B–23, B–100
cleanerbottle, B–18
external fluid containers, B–15
instrument status, B–46
ISE status, E–21
printer status, D–46
sample status, B–44
wastecontainer, B–17
watercontainer, B–16, B–86
classification of safety notices, A–5
Clean and disinfect housing, maintenance action, C–21
Clean ISE tower automatically,
maintenance action, E–50
Clean ISE tower manually, maintenance action, E–51
Clean probe manually, maintenance action, C–12
Clean reagent disk and sample area,
maintenance action, C–14
Clean rotor and heating channel,
maintenance action, C–10
Clean the water and waste containers,
maintenance action, C–16
cleaner
checking external bottle, B–18
replacing bottle, B–18
cleaner bottle, A–52
cleaning
ISE tower off the instrument, E–36
ISE tower on the instrument, E–51
waste container, C–17
water container, C–16
cleaning up
database, C–23
results, B–84
Cleanup database, maintenance action, C–23
clearing paper jam, D–46
collapsing lists, A–74
colors
alarm LED, A–81, B–48
cleaner button, B–18
concept, A–69, A–72
cuvette buttons, B–28
instrument buttons, B–47
ISE bottle buttons, E–30
ISE LED, E–10
LEDs, A–41, A–117
maintenance actions, B–19
reagent buttons, B–25
sample buttons, B–44
test buttons, B–31
waste button, B–17
water button, B–16
components
disposal, A–11
instrument, A–43
ISE unit, E–10
concepts
–calibration, A26
colors in screens, A–69, A–72
–wizards, A69
condensation, removing from the reagent cooler, B–124
Condition ISE tubing, maintenance action, E–46
configuration, B–133, B–157
Abs. adjustment, B–167
calibration definitions, B–165
changing values, B–135
date and time, B–167
extra wash definitions, B–168, B–169, B–170, B–171
host definitions, B–163
maintenance days, B–167
QC definitions, B–165
result handling, B–165
screen, A–106
system definitions, B–166
viewing values, B–135
workflow definitions, B–161

Table of Contents

Related product manuals