Section 1 - Safety
HV-18 revised 11/18 SCHWARZE HYPERVAC 13
SAFETY
Sweeper Safety 07/18 Safety Section 1-5
© 2018 Alamo Group Inc.
SAFETY
OPERATOR SAFETY CONTINUED
Visibility conditions when operating
Operate in daylight or with lights that gives at least 50 yards clear visibility.
Be able to see and identify passersby, steep slopes, ditches, drop-offs, overhead obstructions, power
lines, debris and foreign objects.
Use extreme care when backing up, vision may be limited, severe damage or injury can occur.
Do not run engines in enclosed building without adequate exhaust ventilation.
Mounting and dismounting truck or equipment:
Only mount or dismount when truck and moving parts are stopped.
Always use three point contact when climbing on or dismounting.
Walkways, steps, and handrails should be checked before use to ensure a proper non-slip surface.
Replace or repair damaged component immediately.
Always engage parking brake when exiting the truck.
Hot surface
Stay clear of hot surfaces such as mufflers, hydraulic pumps, valves and tanks.
Relieve pressure from tank, reservoirs, valve and hoses before servicing or opening.
Safety Signs:
Replace missing, damaged or unreadable safety signs immediately.
Equipment guards
Never operate equipment if machine guards are damaged or missing.
Replace missing or damaged guards immediately
.
Riding Passengers:
Never allow passengers whose presence distracts from safe operation or transporting implement.
If passengers presence is needed, passenger must be seated securely and belted in passenger seat.
DO NOT allow passenger in any other location of implement during operation or transport.
Communication:
Verbal communication can be difficult and dangerous near implement.
Operation instructions and directions should be made prior to starting implement
If communication is necessary completely shutdown and exit implement.
Never allow anyone to approach implement during operation or transport.