EasyManua.ls Logo

Selco EB 70 - Appendix C. Transport and Installation

Selco EB 70
94 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
&
BIESSE S.p.A. Woodworking Machinery
(l111h044.fm-141101)
$SSHQGL[& 7UDQVSRUWDQG,QVWDOODWLRQ
'$1*(5
5HDGFDUHIXOO\WKHIROORZLQJLQVWUXFWLRQVEHIRUHFDUU\LQJRXWDQ\RSHUDWLRQZKDWVRHYHU
The machine may be shipped using different means of transport (road, rail, air, and sea), and this
is usually established with the customer at the time of purchase. The machine is split into different
parts in order to facilitate transport and in this appendix there is a list of the parts that are
transported (see page C - 2) together with their weights.
The lifting operations that are necessary for unloading the machine must be carried out by suitably
qualified personnel who shall follow the indications given in this appendix on page C - 2.
The machine installation area must be aired and lit, and appropriately dimensioned as well as
equipped with suitable points to connect the different systems (electric, pneumatic, etc..). With
regard to this, please see the paragraph “Machine Configuration, Connection Points, and Overall
Dimensions” on page C - 5. The machine connection systems and the relative installation area
shall meet the requirements described in page C - 6.
The machine assembly, levelling and connection operations are the responsibility of BIESSE
assistance service personnel. Therefore, it is strictly prohibited to remove the packaging, to open
any boxes containing any equipment and, above all, to start the machine without the prior approval
of the above mentioned qualified expert personnel.

Table of Contents