EasyManua.ls Logo

SICK DUSTHUNTER T - Page 259

SICK DUSTHUNTER T
552 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating Instructions FLOWSIC100
Gas Velocity Monitor
Assembly and Installation
88012513/03-2008 © SICK MAIHAK GmbH · Germany · All rights reserved 67
The following must be carried out before the flanges with pipe are mounted:
Cut out suitable oval openings (apertures) in the duct wall (see Appendix for templates).
Bevel the flange pipes at an angle of 45
° or 60°.
If necessary, adapt the flange pipes to the wall curvature as shown in Fig. 3.12.
Fig. 3.12: Adapting the flanges with pipe
The length of the flange pipe L
F
(L
F45
, L
F60
) depends on the mounting angle α, wall thickness
w, and nominal length NL (see Fig. 3.11 and Fig. 3.12). This correlation is expressed by the
following formulas:
α b
45° 10
60° 8
Di (mm) a (mm)
500 ... 290 0
290 ... 150 3
L
F
45°
60°
(87°) (87°)
48.3
a
L
F
60
L
F4
5
L
F
NL x+=
L
F45
L
F
48.3=
L
F60
L
F
27.9=
x
48.3 35+
2 αtan
-----------------------------
wb+()
αsin
---------------------
=

Table of Contents

Related product manuals