EasyManua.ls Logo

SICK DUSTHUNTER T - Page 262

SICK DUSTHUNTER T
552 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FLOWSIC100 Operating Instructions
Gas Velocity Monitor
Assembly and Installation
70
©
SICK MAIHAK GmbH · Germany · All rights reserved
88012513/03-2008
Prerequisite for Use of the Control Unit MCU-P (for FLSE100-MAC and HAC)
Additionally to the general requirements the following is prerequisites apply:
The purge-air unit must be mounted at a location with clean air. The intake temperature
must match the values specified in the technical data (see Section 2.6). If necessary, lay
an intake hose at a location where the conditions are more favorable.
The purge-air hoses to both sender/receiver units should be as short as possible. They
must be of equal length (max. hose length in each case 10 m).
The purge-air hoses should be laid in such a way that water cannot collect. If necessary,
provide a small opening at the lowest point on the hose (with a screwdriver, for example).
If the control unit must be mounted at more than 10 m distance, the following equipment
is additionally needed:
a separate fan unit (dimensions and mounting dimensions as MCU-P; Part No
7040289)
two purge-air hoses 40 (Part No 5304683, bulk stock)
two adapters 40-25 (Part No 7047019)
3.2.3 Installing the Connection Box
For assembly at stone /
concrete ducts suitable
mounting set are avail-
able.
This modules should be mounted on a level base plate (secure with 2 bolts M4x20).
Fig. 3.14: Mounting dimensions for connection box
Clearance for cables
> 150 > 15080
52
M4
113
125

Table of Contents

Related product manuals