EasyManua.ls Logo

SICK DUSTHUNTER T - Page 507

SICK DUSTHUNTER T
552 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
C. Installation & Caution
-. In terms of structure, the device can be installed with mounting only. But in
case of hard vibration and movement with mounted, be careful not to have
transformation of the structure by using rail at the bottom of the device or other
strengthener.
-. The device is adjustable to AC 220V. Be sure to check voltage type before
electric power supply.
-. Key-Pad on the front of device can be operated with small amount of pressure.
Be careful not to shorten lifetime by forced power and harm surface of the device
by using sharp thing. Key-pad damage could affect high-cost components
installed in main CPU rack.
-. D/L and FEP S/W installed in the FEP are to set up tens of variables. After set-
up change, be sure to put off power supply after closing S/W according to
normal procedure to avoid power supply black-out before saving the modified
data.
-. Be sure to check up H/W specification before connecting In/Out signal line to
the D/L.

Table of Contents

Related product manuals