16
8009441/YN36/V3-0/2015-08| SICKOPERATING INSTRUCTIONS|GM35
Subject to change without notice
PRODUCT OVERVIEW
beam path. Reference filters are then moved into position to control the check point. The
spectral properties of the device are checked using a test gas cell. If a check cycle reveals
that the system is not functioning in accordance with the operation specifications, the
GM35 measuring system outputs appropriate error or warning messages.
Triggering options
1 Di 1 (falling edge): The check cycle can also be suppressed with this function.
2 Time interval, adjustable via the menu of the EvU.
Sequence
1 Check cycle is started.
2 Internal reference measurement is executed. Signal: Relay 3 (function check)
3 The zero point and check point are output on the EvU display and the assigned analog
outputs for 90 seconds each.Relay 3 remains active.
Fig. 5: Determining the check point
Observe the following for connecting to an emission computer: Measure the
time from the start to the output to compensate differences in the device
settings.
Measuring
Zero point
Check
Zero point
Check point
(70% fsc)
Zero point reflector
Swivel element
Data recorder