EasyManua.ls Logo

SICK GM35

SICK GM35
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
35
8009441/YN36/V3-0/2015-08| SICK OPERATING INSTRUCTIONS|GM35
Subject to change without notice
INSTALLATION
4.4 Electrical connection of system components
Onsite preparation for electrical installation has been described in “Preparations for elec-
trical installation”, page 25. The cables laid as described there are now connected to the
system components.
4.4.1 Electrical connection for the purge air unit
The technical data of the standard purge air unit are contained in
“Technical Data, Con-
sumables and Spare Parts”, page 113.
Fig. 19: Purge air unit: Electrical connections for blower motor and low-pressure monitor
WARNING: Observe safety information as well as relevant safety regulations!
During all work on electrical equipment, disconnect such equipment from the
mains, check that the equipment is potential free and make sure no third
person can switch the equipment back on again without authorization.
<
<
>>
=
=
<
<
=
=
>
>
7,333
<=>
=><7,
7,333
<=>
=><7,
Low-pressure monitor
connection
SLV
UW
Terminal box
blower motor
Delta connection
Star connection
Motor circuit
breaker
NO contact, switches at
approx. 35 hPa
underpressure

Table of Contents

Other manuals for SICK GM35

Related product manuals